  • Sydney Water Pressure Tunnel Upgrade
  • Duplex Project
  • Aged Care Facility Upgrade
  • Residential New Build
  • Industrial Electrical Install
Sydney Water contractor
Arrow were engaged as head subcontractor to provide power upgrade for 16 sites from Potts Hill to Waterloo including all electrical. We are very proud to report there were zero LTI’s on this project.
Value: $2.5million

 

Level 2 Electrical installation Sydney
Arrow were engaged by a Private Developer for a residential development to provide power to the sites and all electrical for the new development. Works were completed on schedule and zero LTI’s.
Arrow were engaged by an Electrician to provide shutdown/disconnect/reconnect and on-site temporary power to enable upgrades to facilities.
Electrical installation
Arrow were engaged by a Private Developer for a 9 site townhouse complex. Delivered from first temporary connection to final electrical fitout Value: $2.5million
Electrician new construction

Arrow Power were responsible for a high level industrial electrical install of multiple exhaust ventilation systems and corresponding upgrades to accommodate on a remote site in NSW.

This job was successfully completed within the time constraints of the client to minimise their downtime on processing. 

Zero LTI's on this project.